One Year of Building My RV-10
March 23rd 2013 was my anniversary for starting my RV-10. I thought I would give a "tour" around my shop to show where I'm at in the build.
For more detailed stats on times etc see my blog.
Enjoy
The following are pictures of all the parts I have completed in one year or are still in work. A tour around the shop!
Fuselage on top of stand. Taicone stored on top of fuselage. LH Fuel tank stored under fuselage. Bottom wing skins on LH side of picture in storage.
RH Fuel tank in work.
LH Wing waiting to moved to stand after RH wing top skin is finished being riveted.
RH wing on stand waiting to finish riveting. Notice harware bins to left side of picture, very handy.
Vertical Stabilizer, Rudder, Elevators in storage. Hardware bags and lists layed out on top for convenience. Stairs to loft on right side of pic.
Horizontal Stabilizer stored on loft. Canopy stored up on the loft waiting to be used, along with many other piece parts.
Panoramic view (makes it look huge) showing the crowded workshop. When the wings are completed they will be moved to the loft and the shop will be rearranged to gain a lot more space.
A normal picture just to put the scale of the shop in perspective.