Hi All - I'm new to the forum and my son and I are building an RV-7 Quick Build slider canopy. We are trying to figure out how to run the wires to the ADAHRS, elevator trim, and ELT, as well as the pitot/AOA lines to the aft end of the aircraft. Unfortunately, we have already riveted the baggage floors and nutplates, so we are looking for another route. I've considered running the lines down the tunnel, but I can't figure out how to exit the tunnel at the aft end at the F-706 bellcrank bulkhead. There isn't enough room to drill an exit hole without drilling very close to the doubler rivets. I've also considered running the lines higher underneath the longeron, but then I have to figure out a way to get the lines up the sidewall in the cockpit. Anybody have a suggestion or photos of how they ran these lines? Thanks!