rjcthree
Well Known Member
I?m adding some equipment that requires mounting, and I?m analyzing existing structures and adding some new brackets, mostly under the panel. The AC is an RV-9A, and I?m stuck hand forming without most of my shop tools at the moment (moved, in temp housing, shop in storage) so some simplicity is required. Right now I?m working with 20g loading to yield of the material, mostly for robustness with respect to vibration, which I can?t really quantify at the moment. I would appreciate some guidance from the experts and those whom have gone before. We?re talking boxes of two and three pounds, nothing big. I have a BSME, so the basics aren?t a problem. Thanks.