Hi all, I’m installing an HS34 and GPS 175 in my RV-8. Due to the way the -8 panel is laid out, I’ll be cutting the panel in place.
I called a reputable avionics shop and was quoted $4–5k for the install, which seems pretty steep to me. At that price, I’m thinking I might as well do it myself.
My biggest concern is getting the panel cutout right. SteinAir built the harnesses, so the wiring side of things shouldn’t be too bad.
I picked up a set of nibblers to make the cut without making a mess or having a Dremel get away from me. For those who have done something similar, how many hours do you think I’m realistically looking at?
I called a reputable avionics shop and was quoted $4–5k for the install, which seems pretty steep to me. At that price, I’m thinking I might as well do it myself.
My biggest concern is getting the panel cutout right. SteinAir built the harnesses, so the wiring side of things shouldn’t be too bad.
I picked up a set of nibblers to make the cut without making a mess or having a Dremel get away from me. For those who have done something similar, how many hours do you think I’m realistically looking at?
