Step 9 on page 07-04 of the RV14A Rudder Assembly plans says to final-drill one hole, attach hardware IAW page 07-11, final-drill the other hole, then separate parts and debur.
I’m confused. Am I supposed to attach the nutplates to the nutplate strip, then screw into one of them before drilling the other hole (through the other nutplate???), then separate and debur? Wouldn’t that defeat the self-locking nature of the nutplate’s non-circular threaded interior?
On page 07-04:

On page 07-11:

I’m confused. Am I supposed to attach the nutplates to the nutplate strip, then screw into one of them before drilling the other hole (through the other nutplate???), then separate and debur? Wouldn’t that defeat the self-locking nature of the nutplate’s non-circular threaded interior?
On page 07-04:

On page 07-11:
