I'm wrapping up some changes to an RV-8...
Remove a carb, install an AFP FM-150 and the appropriate pumps
Install a Raven inverted oil system
Install a flop tube in the left tank per Vans drawings
Install second seat belt anchor points, both seats
Install rear seat rudder and brake pedals, w/ links
Do a fresh weight and balance.
FWIW, I expect the aircraft to come in slightly heavier, but not significantly different in terms of CG location.
The Operating Limitations contain the usual wording, which (to paraphrase) requires a determination of major or minor change as defined in 14 CFR 21.93, and if "major", informing the geographically responsible FSDO with a proposed test area. When approved, the aircraft is logged back into Phase 1 for five hours, or more if directed.
What say ye...major or minor?
Remove a carb, install an AFP FM-150 and the appropriate pumps
Install a Raven inverted oil system
Install a flop tube in the left tank per Vans drawings
Install second seat belt anchor points, both seats
Install rear seat rudder and brake pedals, w/ links
Do a fresh weight and balance.
FWIW, I expect the aircraft to come in slightly heavier, but not significantly different in terms of CG location.
The Operating Limitations contain the usual wording, which (to paraphrase) requires a determination of major or minor change as defined in 14 CFR 21.93, and if "major", informing the geographically responsible FSDO with a proposed test area. When approved, the aircraft is logged back into Phase 1 for five hours, or more if directed.
What say ye...major or minor?








