Looking for advice. Installing dual PMAGs on a Vertical Power VPX Pro system. There are two options:
1. Use the VPX Pro to power the PMAGs until their onboard generator takes over, this simplifies everything greatly. I like this.
2. Use a dedicated IBBS battery to power the PMAGs through physical circuit breakers with a pass-thru to the main battery (already installed, would remove if choice 1 is the way to go).
Separate PMAG run-up test switches in either case.
I can see benefits to both, leaning towards simplicity. Any advice is appreciated!
1. Use the VPX Pro to power the PMAGs until their onboard generator takes over, this simplifies everything greatly. I like this.
2. Use a dedicated IBBS battery to power the PMAGs through physical circuit breakers with a pass-thru to the main battery (already installed, would remove if choice 1 is the way to go).
Separate PMAG run-up test switches in either case.
I can see benefits to both, leaning towards simplicity. Any advice is appreciated!