skyking902001
Well Known Member
On the plans for the vertical stab, there are 6 holes (each side) along the bottom edge used for attachment of the empennage fairing. The plans note to leave them open for the fairing attachment. My question-should these 6 holes be dimpled in the skin as well as the underlying 704/705 rib? Or should they just be left drilled to #40? Thanks in advance--
Sky
8/8A?
Sky
8/8A?