How hard should it be to get the holes in the landing gear weldments to line up with the spar (top and bottom)? I can get things to line up and should be able to get the bolts through, but probably not w/o 'threading' the bolts into their respective holes. Are the weldments supposed to line up so I can easily push the bolts through by hand? Maybe I have more work to do before installing these parts, but I thought I'd ask first.
Thanks.
Thanks.