I have reviewed previous threads regarding this but some of the threads were a little old.
We are about to mount the wings and have found that the fit and finish of the doublers on the spars and spar boxes are less than perfect.
I have standard 7/16" bolts as temporaries and they mic out at a good size.
What concerns me is the line up of the doublers to the spars - it looks like they need a good reaming but I am loath to start doing this.
What have people been doing recently with current production kits to get around this problem.
We are about to mount the wings and have found that the fit and finish of the doublers on the spars and spar boxes are less than perfect.
I have standard 7/16" bolts as temporaries and they mic out at a good size.
What concerns me is the line up of the doublers to the spars - it looks like they need a good reaming but I am loath to start doing this.
What have people been doing recently with current production kits to get around this problem.