pecanflyboy
Well Known Member
The short of the long story is that I have a newly built RV-7 horizontal stabilizer and elevator that I'm about to take to paint, and then install on my flying aircraft. I installed the doublers for the elevator spar cracks per SB 14-02-05, which was easy.
I have the kit for SB 14-01-31 to permanently comply with the service bulletin for the horizontal stabilizer cracks. It is a bigger job then I thought.
Is it worth all the work to install this kit on the horizontal stabilizer? Obviously, it is a good time as it is off the airplane and has yet to be painted.
$
I have the kit for SB 14-01-31 to permanently comply with the service bulletin for the horizontal stabilizer cracks. It is a bigger job then I thought.
Is it worth all the work to install this kit on the horizontal stabilizer? Obviously, it is a good time as it is off the airplane and has yet to be painted.
$