Hey guys,
I'm in the early phase of fuselage, and the holes that attach the baggage floors to the bulkhead are in very tight locations. I have to flex the floors by A LOT to position the hand squeezer perpendicular. And if I do that, the flange tends to tip up. I suppose I can use clamps to help, but I was wondering if you have a better way to set them.
I'm also confused about why the KAI asks to use two flush sets, given that most rivets are dome-head
. Am I missing something here?
I'm in the early phase of fuselage, and the holes that attach the baggage floors to the bulkhead are in very tight locations. I have to flex the floors by A LOT to position the hand squeezer perpendicular. And if I do that, the flange tends to tip up. I suppose I can use clamps to help, but I was wondering if you have a better way to set them.