
Working on the Common Wiring section…page 9
When wiring the left side spar pin switch you pass the sender ground wire thru 2 parts of the frame. The plans show snap bushings in place, but you are not told to install them until page 23 along with an additional wire. The bushings called out fit the holes, but the ring terminal and spade connector on the ends do not fit thru the SB. Is this another area where you split the bushing to make them fit over the wires? Thanks.