What's new
Van's Air Force

Don't miss anything! Register now for full access to the definitive RV support community.

Page 13-03, Step 1 Just Checking

md9680

Well Known Member
Friend
It says:

Step 1: Except for holes already match-drilled on Page 13-02, Step 4, final-drill #40 all the .094 (2.4 mm) holes in the flanges of the W-00006-L Main Spar Assembly.

Does this final-drilling include the marked "DO NOT MATCH-DRILL" areas shown on Page 13-05 Figure 1?
 
It says:

Step 1: Except for holes already match-drilled on Page 13-02, Step 4, final-drill #40 all the .094 (2.4 mm) holes in the flanges of the W-00006-L Main Spar Assembly.

Does this final-drilling include the marked "DO NOT MATCH-DRILL" areas shown on Page 13-05 Figure 1?

Yes, you need to final drill those #40 now because in step #6 you’ll be riveting the access cover nutplates in those holes with a AN426AD3-3.5 rivet.
 
Back
Top