Don at Airflow
Well Known Member
Since we have a lot of RV pilots using our products, we figured this would be a good place to alert operators of this issue. The bulletin is on our web site also.
Bulletin No.: Date: 9/23/2009
Subject: Flow Divider/Purge Valve Assembly
Owners/Operators of Airflow Performance Fuel Injection Systems, incorporating a Flow Divider/Purge Valve Assembly. An inspection of the pipe nipple between the flow divider and purge valve assemblies is required before further flight. If your system was purchased between 1994 and 2002 there may be a blue anodized aluminum pipe nipple (AN911-1D) in this location. This fitting needs to be changed to a stainless steel pipe nipple. You may send in your assembly for a replacement for this part or you may call and give us the serial number of the flow divider and we will send you a stainless steel fitting to replace the aluminum fitting.
Give us a call if you have any questions about this subject.
Don
Bulletin No.: Date: 9/23/2009
Subject: Flow Divider/Purge Valve Assembly
Owners/Operators of Airflow Performance Fuel Injection Systems, incorporating a Flow Divider/Purge Valve Assembly. An inspection of the pipe nipple between the flow divider and purge valve assemblies is required before further flight. If your system was purchased between 1994 and 2002 there may be a blue anodized aluminum pipe nipple (AN911-1D) in this location. This fitting needs to be changed to a stainless steel pipe nipple. You may send in your assembly for a replacement for this part or you may call and give us the serial number of the flow divider and we will send you a stainless steel fitting to replace the aluminum fitting.
Give us a call if you have any questions about this subject.
Don