as of last night I was only setting the skin on and trying to get everything to line up and set flush, today I drilled the top leading edge skin to the main spar. the plans say the skins are .050 over so i cleaned up the top edge where it butts against the top skins, set it as tight as i could and drilled it. waiting for more clecoes, from avery, to drill the ribs.