I'm riveting the tailcone on the -10 and a couple of the flanges on the F-1011 bulkhead are sitting proud. One that goes on the stiffener and one on the bottom of the curve. Both of these locations only have one rivet so I can't use a cleco to help. There isn't enough room to get another finger in there plus the bucking bar.
The only way I can think of to make this work is to try and tape down the flange and then try and use a piece of foam with a hole in it to try and use the bucking bar to push it down.
Is there a better way?
The only way I can think of to make this work is to try and tape down the flange and then try and use a piece of foam with a hole in it to try and use the bucking bar to push it down.
Is there a better way?