Hi together,
I rebuild the new horizontal stabilizer and elevator with the improved design for my -8.
In some points the building instruction is a little bit confusing, particular with the new doublers at the HS spar.
I have questions concerning the doublers in the elevator spar at the rod ends:
Do I need to drill ALL prepunched holes (see picture) in the doubler through the spar and reinforcement plate?
Should I drill/ream the hole for the rod end bearings?
Thanks you,
Anna
![](/proxy.php?image=http%3A%2F%2Fimg5.fotos-hochladen.net%2Fuploads%2Ffoto6pzc0i9f82.jpg&hash=55e64233a83f76d293f0b3f495dcf483)
I rebuild the new horizontal stabilizer and elevator with the improved design for my -8.
In some points the building instruction is a little bit confusing, particular with the new doublers at the HS spar.
I have questions concerning the doublers in the elevator spar at the rod ends:
Do I need to drill ALL prepunched holes (see picture) in the doubler through the spar and reinforcement plate?
Should I drill/ream the hole for the rod end bearings?
Thanks you,
Anna
![](/proxy.php?image=http%3A%2F%2Fimg5.fotos-hochladen.net%2Fuploads%2Ffoto6pzc0i9f82.jpg&hash=55e64233a83f76d293f0b3f495dcf483)