Lynnb
Well Known Member
So I had some issues squeezing an AN470AD4-6, and after drilling it out twice I realized I needed to go up a size. Since I had some AN470AD5-6 cherry max rivets I thought this would be the perfect fix. I drilled, pulled it and moved on. Well I went back today and was looking at it and realized I could move it slightly up and down in the hole. So I figure this one needs to come out too. Did I do something wrong when I squeezed it? Was the 5-6 to long to replace a 4-6? If I order an AN470AD6-6 from vans and shoot it, will that be the right correction, or should I find an AN470AD5-6 that I can shoot and save the cherry max rivets for elsewhere?
Thanks,
Lynn
Thanks,
Lynn