The first part of my kit is supposed to arrive in the next month. I haven’t done much thinking about which engine to order ( EFii, compression, etc.) and initially thought I would have ample time to figure it out. I’ve heard that the wait for an engine can now be up to 2 years so I feel a little pressure to get something on order. I’m sure that this has been discussed at length in the past. Can someone point to to a good thread on the topic?