Hey Guys. Still a new builder and need some advice from the Vans community. I'm getting close to the end of my empennage kit and trying to install the electric trim kit. I couldn't find any directions in my empennage kit package, but the info was on the drawings. I installed the servo brackets as I thought was correct, but the control horn of the servo is off center of the hole for the control rod. I've checked and doublechecked and I followed the plans precisely.
The drawings show 1 3/8" from the inboard edge of EET-602B-L to the outboard edge of E-616PP. Looking at how it lays after assembled, it almost looks like I need to reverse the parts (i.e. 1 3/8" from the outboard edge of EET-602B-R to the inboard edge of E616PP)
Did I miss something? Anyone else seen this? I've already ordered the Replacement E-616PP
The drawings show 1 3/8" from the inboard edge of EET-602B-L to the outboard edge of E-616PP. Looking at how it lays after assembled, it almost looks like I need to reverse the parts (i.e. 1 3/8" from the outboard edge of EET-602B-R to the inboard edge of E616PP)
Did I miss something? Anyone else seen this? I've already ordered the Replacement E-616PP