Van's Air Force

The definitive Van's Aircraft support community! Buying, building or flying an RV? Join our exclusive family of mentors and enthusiasts!

double flush specifications, 21-10 step 3

dbhill916

Well Known Member
Friend
Patron
Hi all,

I just finished squeezing the double flush rivets called out in 21-10 step 3 (sandwiching a bearing for the Control Column Mount Assembly). No matter how hard I squeeze, I can't get the shop head flush with the surface. I'm about 1/16" proud.

Question #1: What are the specifications for the shop head in such a case?

Question #2: Is it acceptable to micro shave the shop head to meet spec?

Question #3: Where would I find the equipment to do such shaving?


Thanks in advance,
-dbh
 
leave em stick up and file them in the end if you need clearance.as long as they deformed to fill the countersink they are doing their job.
 
Back
Top