Louavul
Well Known Member
Prepping to make the final assembly and riveting of the fwd to aft fuse and wondering about the double flush riveting of the foward carry-through spar flange to the lower fwd skin.
How does one make a double flush rivet? Does the hole on the bucktail side need countersunk?
Thanks in advance,
Steven L Hild
La Vernia, TX
RV-7 N590SC (res)
How does one make a double flush rivet? Does the hole on the bucktail side need countersunk?
Thanks in advance,
Steven L Hild
La Vernia, TX
RV-7 N590SC (res)