47iS/U-06 Step 1. states "Refer to Section 5.18 for information on match-drilling opaque fiberglass parts." Section 05-18 includes steps 17-25 that call for applying an epoxy/flox mixture to the "bracket" to close any small gaps between it and the fiberglass. Does this procedure apply in the case of the spinner? "Bracket" would have to mean the forward spinner bulkhead in this context. I'm asking because I have not found an RV-12 builders log or forum thread that shows that being done. However, an RV-6 builder friend says he did it when building his airplane. Hence my uncertainty. I'd appreciate any hints for doing this, if it's necessary.