I'm working on page 26-16 and I'm totally confused. The plans refer to the ribs shown on this page interchangeably as both seat and baggage ribs. For example, Step 2 calls F-01423A-L & R baggage ribs. Step 3 calls them seat ribs. Which is it????
The main caption on Figure 1 says "Dimple seat ribs" but most of the steps refer to them as baggage ribs. I think they are all baggage ribs but I'm not sure.
I figured out how to do all the steps by looking at the diagram except Step 1. It says "Dimple the #40 holes in the lower flanges of the baggage ribs shown". Is it asking me to dimple the lower flange holes in every rib shown on this page?
The main caption on Figure 1 says "Dimple seat ribs" but most of the steps refer to them as baggage ribs. I think they are all baggage ribs but I'm not sure.
I figured out how to do all the steps by looking at the diagram except Step 1. It says "Dimple the #40 holes in the lower flanges of the baggage ribs shown". Is it asking me to dimple the lower flange holes in every rib shown on this page?