and here is the proof. Five years of building culminated with 4 hours very detailed inspection. I've never worked that hard in my life as today Every possible cover was opened, every control surface bolt checked for threads showing, even quality of shop head rivets on longeron/skins were checked. Engine was run and parameters were recorded. Thank you VAF for motivation and contribution!
Great Birthday present, isn't it? Time for some serious training now...
Great Birthday present, isn't it? Time for some serious training now...