Hi everyone.
I'm trying to do the maths on QB vs standard RV8 kit. When I first started my -8 emp kit back in 1998, the standard kit was widely thought to require ~2000 build hours. But since then, kits are now prepunched (on what work I was able to do on the emp, I spent a LOT of extra hours agonizing over jigs and alignment) and the QB kits are also available.
Does anyone have *actual* build times from workshop ready to flying on an 8 or 8a, QB or standard?
Thanks very much in advance
Chris
I'm trying to do the maths on QB vs standard RV8 kit. When I first started my -8 emp kit back in 1998, the standard kit was widely thought to require ~2000 build hours. But since then, kits are now prepunched (on what work I was able to do on the emp, I spent a LOT of extra hours agonizing over jigs and alignment) and the QB kits are also available.