Trying to locate air hose inlets to f-1006 bulkhead and am seeing that the height of the overhead for the opening is about 2" so when the scat fitting is mounted the flange of the o/h will be blocking air flow. What is the best way to approach this?
Those are the same fittings I have, I guess even though the flange of the overhead will be right in front of the opening there will still be adequate airflow.
Thanks Bill for the tip of waiting to rivet the fittings til later,
Dave