I’m purchasing an RV-8 kit that is partially complete, and I could use some advice on transporting it. Transport distance is about 85 miles. The fuselage is mostly complete with the landing gear and tail section attached as well as the engine. This obviously constitutes the largest part of the project. My first transport option is to use two large enclosed trailers. I would have to remove the tail section as it is too wide for the trailer. I do believe the landing gear would fit but would need to verify. How complex would it be to remove the horizontal stab?
Second option would be one enclosed trailer for the wings and several other boxes of parts, tools, etc. The fuse would go on an open trailer. I’m not crazy about this option because of the exposure to wind, weather, road debris, etc, but it would be doable.
Third option is to rent a box truck large enough for everything. Penske has 26 footers available near me. Not crazy about this either because the truck bed would be much higher than a trailer bed. Pushing the fuse up ramps or trying to use a lift gate could be very unstable or tricky.
Any thoughts, suggestions would be appreciated.
Second option would be one enclosed trailer for the wings and several other boxes of parts, tools, etc. The fuse would go on an open trailer. I’m not crazy about this option because of the exposure to wind, weather, road debris, etc, but it would be doable.
Third option is to rent a box truck large enough for everything. Penske has 26 footers available near me. Not crazy about this either because the truck bed would be much higher than a trailer bed. Pushing the fuse up ramps or trying to use a lift gate could be very unstable or tricky.
Any thoughts, suggestions would be appreciated.






