Stansuski
Member
I am going to have to perform this bulletin now as the 25 hour inspection timeframe did not suffice. This caused the original #2 pipe to break in two. I was at 4500’ and had no choice but to continue to home destination ( I did not know what had happened at the time). The break burned a hole thru the inner part of the lower cowling going to the radiator passageway. I now have a cowling that will need repair, but will be fine. In hindsight I guess I should have just replaced it sooner but with all the other bulletins I had to do and the fact that when I inspected it I saw absolutely no issues. Total time is 220 hours. I figured I would pass this along to remind any others needing this done to move it up the list , parts of course are on Backorder.
Stan.
Stan.