Morniní guys/ladies,
My Finish kit is on order and Iím curious about how to raise the fuselage in order to install the landing gear. The tail cone is not attached yet, per Vanís advice. I have a forklift and an overhead hoist.
How did you guys do it?

Regards,
__________________
Rv10 Sold
46 years ag pilot/CFI
Air Tractor 502/PT-6
Building RV-12, Wings, fuse, emp complete. FWF in progress.
Reply With Quote
  #2  
Old 01-12-2021, 04:42 AM
rleffler's Avatar
rleffler rleffler is offline
 
Join Date: Jun 2006
Location: Delaware, OH (KDLZ)
Posts: 4,220
Default

When I lifted my RV-10 fuselage, my son and I just picked it up and placed it on an EAA workbench. Getting off the workbench was a little more interesting, but not a big deal. Simply slide it forward and let gravity assisting until the nose wheel touched. We did have an extra person available to pull the workbench out of the way to lower the mains.

If you had the assistance of 2-4 folks, it shouldnít be that difficult for your rv-12 since itís lighter.

During the build, I used some 1 x 6 boards a few inches wider than the fuselage to to store the empennage hanging from the ceiling. I cut small notches in the end to place straps. The notches at the end prevent the straps from compressing the sides and held the straps away from the sidewalls. You could do something similar with your forklift.
__________________
Bob Leffler
N410BL - RV10 Flying
http://mykitlog.com/rleffler
Reply With Quote
  #3  
Old 01-12-2021, 10:05 AM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 5,760
Default

With my 6 and 10, I used an engine hoist with a strap on the engine mount. Doing this, there is very little weight on the tail cone. Even my wife could hold it while I lifted the front and then set it on a saw horse. I put another saw horse under the wing spar carry through area and set it down on that for leg mounting.

Larry
__________________
N64LR - RV-6A / IO-320, Flying as of 8/2015
N11LR - RV-10, Flying as of 12/2019
Reply With Quote
  #4  
Old 01-12-2021, 11:32 AM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 4,188
Default Lift fuse

On my 7a, I use the rotisserie. I lift the tail and Sweetie puts a sawhorse under the center section. Then lower the tail and the rotisserie comes off the ground. If it needs to be higher, add couple of 4x4s under the rotisserie and repeat. That all ends pretty soon. Gear and engine will be going on.
__________________
Larry Larson
Estes Park, CO
http://wirejockrv7a.blogspot.com
wirejock at yahoo dot com
Donated 01/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved (2,000+ hours)
HS SB, empennage, tanks, wings, fuse, working finishing kit
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #5  
Old 01-12-2021, 11:55 AM
Caummisar's Avatar
Caummisar Caummisar is offline
 
Join Date: Jun 2007
Location: Idaho Falls, ID
Posts: 141
Default

Quote:
Originally Posted by rleffler View Post
When I lifted my RV-10 fuselage, my son and I just picked it up and placed it on an EAA workbench. Getting off the workbench was a little more interesting, but not a big deal. Simply slide it forward and let gravity assisting until the nose wheel touched. We did have an extra person available to pull the workbench out of the way to lower the mains.

If you had the assistance of 2-4 folks, it shouldnít be that difficult for your rv-12 since itís lighter.
Was the engine mounted when you installed the gear?
__________________
VAF# 835
RV-7A- /FWF/Engine Mounted/Big cut soon
Slow build --- ALL THE WAY
Victim of SB-632-B
2021 Dues Happily Paid
Reply With Quote
  #6  
Old 01-12-2021, 01:44 PM
AlpineYoda AlpineYoda is offline
 
Join Date: Nov 2019
Location: Boulder, CO
Posts: 239
Default

My hangar has a forklift. I placed an old pallet under the baggage door / RV-10 rear step and I covered the pallet in cardboard and styrofoam blocks to protect the metal skin. I picked up the whole fuselage (no engine at that time, just complete tail and fuselage) inch by inch, testing that it would not easily rock off the forklift and fall, until it was high enough to insert the gear.

It did take me 3 or 4 tries to find exactly the right place for the pallet and lifting point to match the CG.
__________________
RV-10 build blog -- https://eaabuilderslog.org/?blproject&proj=7ZSwfzr2g
Started 12/19/2019
Engine hung 1/9/2021
Panel in 2Q 2021
Flying summer 2021?
Going for the build speed record. Thanks lockdowns!

N1814T reserved with FAA
Donated Jan 11 for 2021, EAA and AOPA member
Reply With Quote
  #7  
Old 01-12-2021, 04:17 PM
daveyator daveyator is offline
 
Join Date: Jan 2011
Location: adelaide, south australia
Posts: 174
Default

A 12 fuselage is pretty light. Got a friend to help and put it up on a couple of well padded, carefully placed saw horses and all was good.
Cheers, DaveH
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On