-POSTING RULES

-Advertise in here!
-
Today's Posts
|
Insert Pics
Keep VAF
Going
Donate methods

Point your
camera app here
to donate fast.
|

02-23-2021, 06:32 AM
|
|
|
Join Date: Jan 2005
Location: McCordsville IN
Posts: 286
|
|
torque stripe
Kentlik,
Good morning Looks like excellent work done on the HS. Please note that the proper use of torque stripe is from the fastner(nut, bolt head) to the base metal. If it is used in the nut to bolt this does not show you any rotation if the 2 rotate together. Keep up the great work.
__________________
Jon Hubbell
RV-6 Flying IO-320X tip up 500+hrs G3X 2004 Oshkosh Outstanding workmanship award, 2004 Sun N Fun Best Workmanship 2006 Sun N Fun Outstanding Aircraft
RV-10 Flying IO-540-C4B5X 500+hrs G3X 2011 Bronze Lindy Award Winner
"Negative Ghostrider the pattern is full"
|

02-23-2021, 09:24 AM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Quote:
Originally Posted by n700jl
Kentlik,
Good morning Looks like excellent work done on the HS. Please note that the proper use of torque stripe is from the fastner(nut, bolt head) to the base metal. If it is used in the nut to bolt this does not show you any rotation if the 2 rotate together. Keep up the great work.
|
Thank you!
Thanks for the tip on the torque goo! I put it on to tell myself I had torqued the nut. Frankly didn't think of the actual area to place it and it seemed like a good place to see if the nut was slipping off the bolt. Good to learn something new every day!
I actually have to remove the darn thing as I got ahead of myself and forgot to drill the other side of the elevator horn...oh well, reset the darn thing.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

02-24-2021, 02:05 PM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
elevators
elevators getting fitted
[IMG] elevators by Kent Luttrell, on Flickr[/IMG]
I haven't put her on the gear yet, I am vertically challenged and it is way easier to work on her when she is lower...
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

02-24-2021, 02:09 PM
|
 |
Senior Curmudgeon
|
|
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,708
|
|
Looking good 
__________________
Mike Starkey
VAF 909
Rv-10, N210LM.
Flying as of 12/4/2010
Phase 1 done, 2/4/2011 
Sold after 240+ wonderful hours of flight.
"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
|

02-24-2021, 03:02 PM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Quote:
Originally Posted by Mike S
Looking good 
|
Thank you, Mike! These last few steps have really helped to keep me slogging ahead.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

02-27-2021, 10:18 AM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Elevator horn drill
I got the horns accurately drilled last night. I made a jig as you would do normally to ensure the holes are straight and true. My horns were basically dead on and it was a push on which one was aft of the other.
[IMG] drill jig by Kent Luttrell, on Flickr[/IMG]
[IMG] elev3 by Kent Luttrell, on Flickr[/IMG]
[IMG] elev2 by Kent Luttrell, on Flickr[/IMG]
[IMG] elev by Kent Luttrell, on Flickr[/IMG]
I didn't have an aluminum block the correct dimension or the milling machine I sold last year to mill it so I stacked up material to get to the correct dimension. As it turns out the AL on the back worked well to ensure the last bit of transition to the second horn worked well and kept it nice and straight.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

02-27-2021, 11:00 AM
|
 |
|
|
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 1,508
|
|
Heck ya man, that will work nice. My horns were certainly further off than yours although not nearly as bad as some others I have seen.
__________________
Jereme Carne
PPL
RV-7A
I can see the light!
Exempt but gladly paying!
|

02-27-2021, 11:45 AM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Quote:
Originally Posted by jcarne
Heck ya man, that will work nice. My horns were certainly further off than yours although not nearly as bad as some others I have seen.
|
Thanks brother!
I was hard-pressed to figure out which one was aft. It turned out really a none event, the drilling.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

Yesterday, 03:29 PM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Vertical stabilizer mounting
I moved on to the Vert. Stabilizer and found that getting this thing mounted and drilled to be quite a challenge, but one that I am up for.
Cut off a portion of the front spar but found I need to take a bit more off, about 0.185
[IMG] Vertspar by Kent Luttrell, on Flickr[/IMG]
[IMG] HOR by Kent Luttrell, on Flickr[/IMG]
[IMG] Aft by Kent Luttrell, on Flickr[/IMG]
[IMG] Emp by Kent Luttrell, on Flickr[/IMG]
Haven't drilled any holes in the new emp to mount it but have found the procedures to get it done.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|

Today, 04:09 PM
|
 |
|
|
Join Date: Sep 2015
Location: Oregon
Posts: 865
|
|
Mounting Vert.
Well...this was about what I expected. Had to use the 90° drill head to get the holes started through the existing holes. I have done this before on other projects and have a few special tools to get it done correctly ie. drill bushes etc.
this one wasn't too bad as I could just get the tool square in both axis with the clamps on.
[IMG] intaft by Kent Luttrell, on Flickr[/IMG]
[IMG] extaft by Kent Luttrell, on Flickr[/IMG]
The bottom two will require another tool to manufacture. Just an extension for the 90° drill head.
__________________
Kentlik
RV-7A in progress
http://www.imdb.com/name/nm0527486/?
Private pilot, ASEL!
EAA 105 Chapter 7S3
Bi-annual financial contributor
"The credit belongs to the man who is actually in the arena..." Teddy Roosevelt
|
Thread Tools |
Search this Thread |
|
|
Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 10:21 PM.
|