View Single Post
  #40  
Old 01-30-2020, 07:08 AM
vernh59 vernh59 is offline
 
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
Default



Starting the F 706 bulkhead components. Drilling the reinforcing angles.





Assembling the bulkhead for match drilling.



Primed bell crank riveting together.



assembled 728 and 729 angles.



Assembled F730, F728 and F729



F706 ready to rivet together.



F707 assembled for riveting.



Double bulkhead F711.
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
Reply With Quote