Hey - we are just a few weeks out from moving into a new home at the airpark in Pecan Plantation. However, we have run into a minor snag with the hangar that we are having built. In the pic below, you can see that the concrete floor rises as you move to the left... it looks like for whatever reason the last 10 feet or so is 3/4" higher than the rest of the floor. The rest of the floor to the right (which you can't see in the pic) looks to be level, as the gap appears consistent.
We are working with the contractor to figure out a solution, but they are coming up blank, so I figured I'd turn the the VAF experts. Is there anyway to grind down the last 10' or so by the required 3/4" to get things back to level?
If not, what is the least bad approach to fix this? Jack hammer it out down to 6" and repour?... entirely cut out that section and repour?
Thanks,
Jason
We are working with the contractor to figure out a solution, but they are coming up blank, so I figured I'd turn the the VAF experts. Is there anyway to grind down the last 10' or so by the required 3/4" to get things back to level?
If not, what is the least bad approach to fix this? Jack hammer it out down to 6" and repour?... entirely cut out that section and repour?
Thanks,
Jason