ron sterba
Well Known Member
(RV9A) I installed my tosten hat switch grip and now have run the wire bundle out the bottom of the control tube. Then a one inch loop and then tie wrapped the bundle for 6" along cross center push rod. At this point is my transition to a connection point with the wires. What iam wondering is how did you get to a stationary/connection point for your wire bundle? The space between the ribs that I plan to have my connection point is the first space left of the tunnel and about 6 inches back of the far aft movement of the cross push rod.WITH THE FLEXING AND PULLING OF THE BUNDLE what are your thoughts for,,,,,, adel clamps,,,,sub-d (sideways-up-down-angle),,,,support bracket,,, distance back for flexing point.and wire sleeve. Thanks Guys and Ladies too.
I just started making a 5" square plate to mount this connection point PLUS my Ray Allan REL-2 relay (elevator trim).
I did the search engine but couldn't find the info. Appreciate your comments and of course any fotos.
Ron in Oregon RV9A
I just started making a 5" square plate to mount this connection point PLUS my Ray Allan REL-2 relay (elevator trim).
I did the search engine but couldn't find the info. Appreciate your comments and of course any fotos.
Ron in Oregon RV9A