I am currently installing firewall components including some current limiter bases. I have a 60amp B&C alternator and a SD-20 stand-by alternator planned. It is my understanding that I would install a current limiter for each however with 2 different fuses. It is my understanding I would come off the contactor & then bar the 2 together?
I notice that a number of buiders will intall a shunt near this arrangement. Is it correct that this is only for location of an ammeter point and/or is there another purpuse? Which systems require this? I notice most who have intalled this plan on a Dynon EFIS. What about AFS? Garmin? Others?
I notice that a number of buiders will intall a shunt near this arrangement. Is it correct that this is only for location of an ammeter point and/or is there another purpuse? Which systems require this? I notice most who have intalled this plan on a Dynon EFIS. What about AFS? Garmin? Others?