I am close to putting on the aft turtle deck for real. Over the course of the build I have had a pad of paper on the bench where I write down steps I hope to do while the aft fuselage is an open canoe before it becomes more difficult to work back there. I have been working through my list but I am curious if I am missing anything obvious.
A few examples of things I have thought about:
Install static ports and figure out static line routing
Fab a magnetometer mount and figure out data wire routing
Install shielded multi conductor wire for LED tail light/strobe
Am I missing anything huge?
For you RV-8 builders, do you have any antennas mounted in the tail cone?
Thanks for your input.
A few examples of things I have thought about:
Install static ports and figure out static line routing
Fab a magnetometer mount and figure out data wire routing
Install shielded multi conductor wire for LED tail light/strobe
Am I missing anything huge?
For you RV-8 builders, do you have any antennas mounted in the tail cone?
Thanks for your input.