AcezHi
Active Member
I was starting to rivet on the top inboard skin on my wing today and noticed that the W-711 ribs have a hole under the fuel tank skins on the main spar that I don't have rivets in yet.
I am at the point where the tank is bolted on with every other bolt and starting to skin the top of the wing.
I don't see what size rivets these should be. I know I need to take the tank back off to install them, but didn't remember seeing anything in the plans or manual for rivet size. I am guessing a 3-3.
I am at the point where the tank is bolted on with every other bolt and starting to skin the top of the wing.
I don't see what size rivets these should be. I know I need to take the tank back off to install them, but didn't remember seeing anything in the plans or manual for rivet size. I am guessing a 3-3.