I am wrapping up the tunnel wires and am having a devil of a time getting the tunnel harness to lay flat just forward of the middle system block so as to not be touched/scrapped by the movable section of the control system. I have the blocks solidly bolted to the aircraft skin and the top half of the blocks well tightened down, but the clearance is so minimal that there is rubbing when the control section there is moved.
Any suggestions?
Any suggestions?