Just wondering how many hours it takes to build an RV-3B. Thanks, Dave
D David Paule Well Known Member Jan 13, 2012 #1 Just wondering how many hours it takes to build an RV-3B. Thanks, Dave
Ironflight VAF Moderator / Line Boy Mentor Jan 13, 2012 #2 Ours was just shy of 2,000 shop hours - flying, but unpainted.
D danbenua Active Member Jan 13, 2012 #3 Just north of 2200 hours, including standard-build wings and paint. Paul and I are both repeaters. A newbie might take longer. - Dan Benua
Just north of 2200 hours, including standard-build wings and paint. Paul and I are both repeaters. A newbie might take longer. - Dan Benua
MrMoisture Active Member Jan 17, 2012 #4 About 15 seconds for the ink to dry on the check... http://www.barnstormers.com/ad_detail.php?ID=618915 Robin RV-4 Sold RV-6A Sold RV-10 300 Hours RV-8A 85 Hours Dreaming of this 3 for solo fun...
About 15 seconds for the ink to dry on the check... http://www.barnstormers.com/ad_detail.php?ID=618915 Robin RV-4 Sold RV-6A Sold RV-10 300 Hours RV-8A 85 Hours Dreaming of this 3 for solo fun...