I'm building my duel G3X panel. Received my TCW back-up battery. After unpacking I ended up with two quick questions.
1
The package tells me I need to go to page 5 of the instructions if the battery isn't placed into service by Nov. Hopping it will be in service this time next year not in two weeks. As I read it Page 5 talks about recharging a fully installed battery. Also the instructions talk to storage beyond 3 mo. to charge with a regulated charger @ o.1 amp. no got. Can I temporarily connect pin 2 through a 2 amp breaker to the installed battery/master and ground via pin 3? I think this looks like the trickle charge for the unit.
2
Install instructions say don't mount under the instrument panel. So where did my fellow RV builders mount the TCW IBBS-12v-4ah?
1
The package tells me I need to go to page 5 of the instructions if the battery isn't placed into service by Nov. Hopping it will be in service this time next year not in two weeks. As I read it Page 5 talks about recharging a fully installed battery. Also the instructions talk to storage beyond 3 mo. to charge with a regulated charger @ o.1 amp. no got. Can I temporarily connect pin 2 through a 2 amp breaker to the installed battery/master and ground via pin 3? I think this looks like the trickle charge for the unit.
2
Install instructions say don't mount under the instrument panel. So where did my fellow RV builders mount the TCW IBBS-12v-4ah?