Hey all-
I'm trying to get an idea of average (aproximate) shop hours required to build the -7 wing kit. Do any of you have rough estimates? I know I'm a slower builder being a bit of a perfectionist & epoxy priming the inners. My empannage took me a tad under 150 hrs. I think average there is about 120 hrs but not sure. Thanks guys.
I'm trying to get an idea of average (aproximate) shop hours required to build the -7 wing kit. Do any of you have rough estimates? I know I'm a slower builder being a bit of a perfectionist & epoxy priming the inners. My empannage took me a tad under 150 hrs. I think average there is about 120 hrs but not sure. Thanks guys.