Lynnb
Well Known Member
I'm trying to rivet the F-1023 Baggage floor angles onto the QB fuselage and ran in an issue. On the Right side I could get to all but 2, so I used MK-319-BS in the two that I couldn't buck.
On the Left side I had 3 open holes I couldn't shoot so I assumed I would do the same, drilled 2 holes to #33 holes and pulled two of the rivets, then realized I should have checked the length. So I drilled them out and now I'm trying to figure out what I should now use for the 1 #40 hole and the two #33 holes that are all dimpled for AN426AD-3 rivets.
Any ideas?
On the Left side I had 3 open holes I couldn't shoot so I assumed I would do the same, drilled 2 holes to #33 holes and pulled two of the rivets, then realized I should have checked the length. So I drilled them out and now I'm trying to figure out what I should now use for the 1 #40 hole and the two #33 holes that are all dimpled for AN426AD-3 rivets.
Any ideas?