I am doing the final hookup of the elevator and find that I have the prescribed 25 deg of down but only 25 deg (instead of the prescribed 30 deg) of up when connected to the control system. Before connecting, I had the full 30 deg of up. Wondering what, if anything, to do about this. I could lengthen the 'push tube' but then might have insufficient down elevator. Advice please...