Im about to rivet the Horizontal stabilizer together and I can't find anything in the construction manual with instructions on two things. The exploded view on the plans has a part that says to "trim the HS rear spar to allow for the elevator control horns to pivot forward and contact the elevator down control stop". Is this step supposed to be done now before riveting the 609PP to the 603PP? Also the plan view has a part that says "Leave open on top side only for empenage fairing attach, 10 places". Do you not rivet the whole edge of HS404 and HS405. It appears to me that there may be some nut plates installed there later for fairing screws. Im still learning how to interpret the plans but it seems like there are several steps in the drawings that are not specific steps in the construction plans..![Confused :confused: :confused:](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)