I inadvertently drilled the holes of the bottom portion of the right elevator spar (E-902) and the bottom of the right elevator skin (E-901) skin the wrong hole size. Instead of being the proper size it is now 5/32?. The pop rivets that are called for in the plans will not hold as they are not large enough. It was suggested that I use Cherry max rivets. According the Cherry aerospace booklet I need 100 degree flush that are 5/32? in diameter with a length of two as measured by the cherry rivet gauge. Will the cherry max rivets be pulled properly with a regular pop rivet puller, or do I need to purchase a specific puller. I would appreciate any guidance anyone may have.
Don MacMillan
Don MacMillan