Assembling left wing now on page 17-02 . Purchased Service Bulletin 14-11-03 effective date December 31, 2014. "Affects all wing kits shipped before Dec 24, 2014" Two doublers, rivets and instructions in the 'bag'.
Question; Was there a plan change for wing kits shipped after Dec 25, 2014?
What changed
I Cannot locate this page on Vans site. I would like a copy of the revised page 17-02 from a later wing kit.
Do all the later kits include the SB doublers?
Question; Was there a plan change for wing kits shipped after Dec 25, 2014?
What changed
I Cannot locate this page on Vans site. I would like a copy of the revised page 17-02 from a later wing kit.
Do all the later kits include the SB doublers?