First, I think that the plans and instructions are very good. However, I have reached one of those points where things don't seem to make sense. I am referring to page 8-40 and drawing 61A. I would rather stop and ask before I start drilling. I have a prepunched 8A fuselage kit and the plans and drawings seem to be missing something. I fabricated the F-896 and F-897 reinforcement angles. However, the plans direct you to drill into the F-897 through the existing holes in the bottom floor panel. Not only are there no holes, but I have a rivet in the way that will have to removed for it to lay flat.
Has anyone else experienced this? What am I missing?
Has anyone else experienced this? What am I missing?