Mark Albery
Well Known Member
The plans only show routing through the various bulkheads but it looks like people run it into the left gear tower top cutout and out
again by the throttle quadrant.
But there are only three holes in the gear tower by the quadrant (-1 kit), presumably for the throttle, mixture and prop controls.
I'm reticent to drill another hole in the gear tower without checking
first. It looks like you could just loop it through 180 degrees without
going into the tower and just tie it in with a few cable ties.
Any suggestions?
again by the throttle quadrant.
But there are only three holes in the gear tower by the quadrant (-1 kit), presumably for the throttle, mixture and prop controls.
I'm reticent to drill another hole in the gear tower without checking
first. It looks like you could just loop it through 180 degrees without
going into the tower and just tie it in with a few cable ties.
Any suggestions?