Hey everyone,
I'm wondering if anyone can help shed some light on the situation with the new fuel injection system that Van's is shipping now. It's my understanding from talking to customers that the new assembly is longer than the old one, and will no longer fit in the old sheet metal box that Van's provides (although we did have one customer that was able to make it fit).
I talked to Vans tech support, and it sounds like there is no set time frame for re-designing the box. We make a lot of sheet metal parts, and are considering making a batch of boxes that are longer. Several customers have expressed interest in this. We would try to keep the cost about the same as the Vans parts (basically at our cost) depending on quantity.
The question is how long to make the box. If anyone with the new system could measure from the front of the fuel valve box to the front of their fuel injection assembly, it would be very helpful. Any pictures of the new system would also be helpful.
Thanks for your help,
Luke D.
I'm wondering if anyone can help shed some light on the situation with the new fuel injection system that Van's is shipping now. It's my understanding from talking to customers that the new assembly is longer than the old one, and will no longer fit in the old sheet metal box that Van's provides (although we did have one customer that was able to make it fit).
I talked to Vans tech support, and it sounds like there is no set time frame for re-designing the box. We make a lot of sheet metal parts, and are considering making a batch of boxes that are longer. Several customers have expressed interest in this. We would try to keep the cost about the same as the Vans parts (basically at our cost) depending on quantity.
The question is how long to make the box. If anyone with the new system could measure from the front of the fuel valve box to the front of their fuel injection assembly, it would be very helpful. Any pictures of the new system would also be helpful.
Thanks for your help,
Luke D.